精品少妇一区二区视频|亚洲欧洲精品久久无码|国产精品你懂的在线播放|91午夜福利人妻无码福利|激情国产一区二区三区四区|最新免费国产无码精品视频|五月天综合网亚洲综合天堂网|亚洲国产日韩精品二三四区91

Language

News

CUMT BACKFILL

It is the mission to improve the resource extraction rate and promote the sustainable development of the coal industry

※ Current Location:Home - News - Industry

What should we pay attention to when operating the concrete mixing trailer pump in winter?

Release Time:2022-05-09      Hit Count:458

When winter comes, due to the decrease of air temperature, the oil temperature and grease temperature of the main oil pump of the concrete mixing trailer pump will decrease. Therefore, when operating the concrete mixing trailer pump in winter, we should pay more attention to construction safety and abide by certain operating rules than in summer. So what should we pay attention to when operating the concrete mixing trailer pump? Specifically, the following ten points can be followed:

1、 The concrete mixing trailer pump shall be as close to the construction site as possible. The outlet pressure of the concrete mixing trailer pump is 8Mpa, the horizontal pumping capacity is 200m, and the vertical distance is 70m. Therefore, the construction distance shall not exceed these two distance values. The construction site of motor version and full hydraulic version concrete mixing trailer pump should have convenient, safe and reliable 380V power source, with small construction interference and safe environment.

2、 Understand the construction site and construction requirements, and the cement type, cement dosage, aggregate gradation, water cement ratio and slump in the pumped concrete shall meet the transportation requirements.

3、 Know whether there are additives in the concrete. In particular, it is required that Zui large aggregate shall not be greater than 1 / 3 of the 200 diameter transmission pipeline of the concrete mixing trailer pump.

4、 Check whether the electrical equipment is in good condition, whether various instruments are normal, and the operating switches and buttons of each part are in the specified position.

5、 Check the water volume of the water tank and observe whether there is oil stain and turbidity. If necessary, drain the turbid water and refill it with clean water.

6、 Check whether the hydraulic oil, lubricating oil level, oil quality and oil quantity meet the requirements. If the power is a generator, check its fuel oil, lubricating oil and cooling water.

7、 Check whether there are chores, slag accumulation, grids and mixing blades in the hopper.

8、 Check the clearance of all parts in the valve, adjust it when it exceeds the limit, and check whether the connecting parts are loose.

9、 Check the tightness of the transmission chain to keep it at the specified position. If it is too tight or too loose, it shall be adjusted.

10、 The number of bends shall be minimized in the layout of the delivery pipe of the concrete mixing drag pump, the connection of each pipe must be tight, and the delivery pipe and pump shall be firmly supported to reduce vibration.

Previous:No!
Next:Tailings filling: choose filling industrial pump or concrete drag pump?

Back to list

Copyright 2022 ? All Rights Reserved XUZHOU CUMT BACKFILL TECHNOLOGY Co., Ltd.
天长市| 伊吾县| 台南市| 铅山县| 延庆县| 临汾市| 杂多县| 永春县| 苗栗县| 涟水县| 广德县| 佳木斯市| 彭州市| 西城区| 衡水市| 云阳县| 陆良县| 松滋市| 合肥市| 阳城县| 金阳县| 康马县| 兴业县| 平山县| 新安县| 九龙城区| 凉山| 姜堰市| 岫岩| 海城市| 大安市| 高淳县| 鹰潭市| 岳普湖县| 宽甸| 子长县| 瑞金市| 莱芜市| 兴国县| 延边| 蓬安县|